top of page

採取行動

該項目將對社區產生長期影響,我們希望所有 Sunset 社區成員參與社區反饋過程,以確保您的聲音被聽到。

社區成員需要採取的行動(您可以執行任何或所有這些行動)

  • 直接寫/發布給主管 Mar - hi的電子郵件地址是marstaff @sfgov.org,Facebook - @d4gordonmar;推特 - @d4gordonmar

  • 直接寫/發佈到 TNDC - Jackson Rabinowitsh 2550irvinginfo@gmail.com ;凱蒂·拉蒙特klamont@tndc.org ,推特@TNDC

  • 直接寫/發布給 Mayor Breed – Facebook @mayorlondonbreed, Twitter - @londonbreed

  • 直接寫信給 MOHCD – Jonathan Gagen,項目經理jonathan.gagen@sfgov.org

  • 寫信給規劃部門- Carly Grob,高級規劃師 carly.grob@sfgov.org

  • 在這裡簽署我們的請願書

  • 在這裡捐贈給我們的法律基金

  • 通知你的鄰居,他們可能不知道這個項目。如果他們有興趣了解更多信息,請讓他們發送電子郵件至2550irvingcommunity@gmail.com,以便我們將他們添加到我們的分發列表中。

  • 參與其中- 發送電子郵件至2550irvingcommunity@gmail.com向我們發送您的具體反饋、想法和疑慮,或者將其添加到我們的分發列表中。如果您想更一致地參與,請自願加入我們的董事會。

如果您想通過電子郵件接收我們的更新,請在此處訂閱或發送電子郵件至 2550irvingcommunity@gmail.com

Anchor 1

PETITION 1 - TO THE SF MAYOR’S OFFICE AND THE SF BOARD OF SUPERVISORS

I, along with the Mid-Sunset Neighborhood Association petition the City of San Francisco to:

 

1.  Remediate the soil gas contamination before allowing new construction on either side of Irving Street.

Consider soil vapor extraction and excavation. This will require an investigation that determines the precise locations of the sources of contamination. Remediation should address the entire soil gas plume.

 

2.  Require mitigation in all existing homes where at least one PCE sample exceeds residential indoor air screening level.  Mitigation should not be at the residents'/homeowners’ expense and is required only where the source of PCE is vapor intrusion.
 

Thank you for helping us make a difference!

PETITION 2 - TO THE DEPARTMENT OF TOXIC SUBSTANCES CONTROL (DTSC)

 

I, along with the Mid-Sunset Neighborhood Association petition the Department of Toxic Substances Control (DTSC) to:

1.  Delineate the Irving Street PCE plume. 

Conduct sampling to determine the full extent of the soil gas plume and indoor air contamination to their respective residential screening levels.

2.  Require mitigation in all existing homes where at least one PCE sample exceeds residential indoor air screening level.  Mitigation should not be at the residents'/homeowners’ expense and is required only where the source of PCE is vapor intrusion. 

3.  Remediate the soil gas contamination before allowing new construction on either side of Irving Street.

Consider soil vapor extraction and excavation. This will require an investigation that determines the precise locations of the sources of contamination. Remediation should address the entire soil gas plume.

 

4.  Require mitigation in new construction.

This should be required on both sides of Irving.  After construction, conduct confirmatory sampling and notify all future residents of the buildings’ and neighborhood’s environmental history.

Thank you for helping us make a difference!

bottom of page